Be they commercial or public transportation entities, airports, airlines, transit systems, rail services, ship loaders, civil air navigation service providers, couriers and more, all rely upon Black & McDonald to provide mechanical, electrical, utility and maintenance services of consistently high quality. At airports alone, our resources have provided services at over 110 airports in Canada. With over 85 years of lessons learned, and ongoing vigorous continuous improvement programs, Black & McDonald presents a multi-trade knowledge base unequalled across the transportation industry.


transportation

Aeroplan Offices

Vancouver, BC

For Aeroplan's 46,000 sq. ft. office renovation, Black & McDonald supplied and installed their new rooftop HVAC equipment complete with sheet metal ductwork and air balancing. New plumbing work for multiple washroom groups and upgrades to the DDC system programming were also added, all completed on-time within the 8 week schedule.

 

transportation

Air Canada Data Centre

Manitoba

Mechanical, electrical, structural and civil trades were utilized by Black & McDonald to upgrade the emergency and uninterruptible power systems (UPS) for the data centre. Two 2,000 kW diesel generators were installed to replace 4 old ones, upgrades were done to the ventilation for the generators, and a temporary generator was used to ensure full independent redundancy emergency power was available throughout construction. Intense pre-planning was required for several critical tie-in procedures to ensure the safety of staff and prevent the compromise of the critical systems and operations.
Owner: Air Canada
Engineer: MCW/AGE Consulting

 

public transportation

Calgary Int'l Airport Baggage
Handling System

Calgary, AB

Black & McDonald undertook this project which consisted of the off-loading, layout, assembly and installation of baggage handling conveyors, and associated equipment, including the removal, modification, and reinstallation of selected existing components & systems.

Owner: Siemens-Demag

 

transportation

DHL Express

Burnaby, BC

To free space for DHL's warehouse by removing an old internal block wall office, Black & McDonald had to restructure the supports for the roof and relocate numerous electrical panels and conveyor control systems, all while maintaining operations. Over 100 electrical circuits had to be identified, replacement panels constructed and the new upgraded electrical service installed. Only powering down on one weekend, the project was completed within the tight 3-week window set by DHL.
Owner: DHL Express (Canada) Ltd.
Engineer: MacForm Construction Group Ltd.

 

public transportation

Hamilton Street Railroad

Hamilton, ON

To supply and install a dust collector for the brake drum machining units, Black & McDonald utilized their sheet metal, electrical and plumbing trades to design a complete system including wiring, controls, air links, and equipment.

Owner: City of Hamilton

 
 
public transportation

Kelowna International Airport

Kelowna, BC

Facility Maintenance and Operations at the airport are managed and supervised by Black & McDonald's on-site contract manager. Labour, supervision, tools, materials and equipment necessary are provided to maintain and repair the following functions: airside and terminal electrical systems, FIDS/BIDS, Tower & FSS touch screen PLC airfield lighting control system, runway, taxiway, and approach lighting, airport hazard & rotating beacons, all mechanical systems including HVAC, janitorial services, ground side snow & ice control, conveyors, carousels, and baggage systems.

Owner: City of Kelowna

 

public transportation

Montreal Trudeau Int'l
Airport Expansion

Montreal, QC

As part of the new extension, Black & McDonald constructed a new boarding area including two access ramps, new ticket counters and boutiques, electrical room modifications, additional electrical and telecommunication rooms and the feeding of a cooling tower system. The high security level demanded very specific planning and coordination.

Owner: ADM
Engineer: B.P.H.

 

public transportation

NAV Canada

Winnipeg, MB

To meet today's standards for the administration and classroom areas, and to permit the future expansion of the building's critical system loads Black & McDonald installed a combination of reciprocating chillers, air-cooled condensers, dry-coolers, rooftop units and a UPS. The project required a tight safety and coordination plan to complete in and around NAV Canada's ongoing air traffic control operations.

Owner: NAV Canada
Engineer: Nova 3 Consulting Engineers

 

public transportation

OC Transpo

Ottawa, ON

As general contractor for the City of Ottawa's Countdown Upgrade project, Black & Mcdonald added a second service bay for buses and a new garage heating/ventilation system, new electrical and emergency power service, upgraded lighting system, new fuel and fluids dispensing systems, and vacuum and bus washing systems.

Owner: City of Ottawa
Engineer: J. L. Richards

 

public transportation

Pearson Int'l Airport –
Common Cabling Systems

Mississauga, ON

Under this contract Black & McDonald Limited was responsible for the installation of the complete structured cabling system (voice & data), certified to Category 6 Standards, within the new Terminal 1. The construction involved installation of primary and diverse fibre optic and copper backbone cabling between 3 main communication rooms to a total of 47 telecommunication closets (TCs) and 15,000 horizontal drops from the TCs.

Owner: Greater Toronto Airport Authority
Engineer: Mulvey & Banani

 

public transportation

Pearson Int'l Airport –
Vehicle Tunnel

Mississauga, ON

Black and McDonald performed all electrical, communication, utility, mechanical, and sheet metal work associated with a 550 meter long four-lane vehicle tunnel and a utility corridor parallel to the tunnel that required open cut excavation across 3 taxiways and one runway. Challenges involved detailed scheduling, staging and security to enable the safe operation of the airport during construction.

Owner: Greater Toronto Airports Authority
Engineer: Morrison Hersfield

 

transportation

Ryder Logistics

Calgary, AB

Working with Intercon Security, Black & McDonald installed the security upgrade to the Ryder Logistics Calgary Warehouse. Scope of security upgrade included surveillance cameras, intrusion detection, access control, intercom, power and fire alarm requirements.
Owner: Ryder Logistics
Engineer: intercom Security

 

public transportation

Toronto Transit -
Bus Garage

Toronto, ON

For the expansion of the Birchmount Bus Garage, Black & McDonald removed 5 bus hoists and installed 7 new ones complete with lube system piping, diesel exhaust system and electrical upgrades.

Owner: Toronto transit Commission
Engineer: Toronto Transit Commission

 

public transportation

Toronto Transit –
Sheppard Subway

Toronto, ON

Black & McDonald supplied and installed the traction power cables, 1500mcm, 535mcm and 5Kv power cables, the isolation switches and D/C tie breakers, and connections of positive and negative rail, compression and cadwelds for the Sheppard Subway.

Owner: Toronto Transit Commission
Engineer: Gerry Stan

 

public transportation

Toronto Transit –
Steam Piping

Scarborough, ON

At the Greenwood Avenue location, Black & McDonald installed new steam and condensate piping on the pipe trestle outside the building to replace the existing piping system.

Owner: Toronto Transit Commission
Engineer: Giffels & Associates

 

 
 
public transportation

Toronto Transit -
Transformer Replacement

Toronto, ON

To replace an existing damaged transformer at the Prince Edward substation, Black & McDonald had to remove the building roof for access. Supply and installation of the new 750Kva 27.6Kv / 4.16Kv cast coil transformer was done complete with transformer testing.

Owner: Toronto Transit Commission

 

public transportation

Voest-Alpine Ship Loaders

Halifax, NS

For the manufacturer Fundy Gypsum Company's Hantsport Facility, mechanical and electrical work was done for assembly of 2 ship loaders (approx 330 ton each). Challenges included building the crane pad to support the crane lifting the loads on a temporary pivot point, and then later moving the loaders to their final location after the modifications.

Owner: Fundy Gypsum Company
Engineer: Rockwell Automation & Voest-Alpine Materials Handling GmbH & Co KG

 

Black & MCDonald
Black & MCDonald
Black & McDonald's depth of experience has made us the partner of choice across a wide range of industries. To get there took time and effort. Our management team invested in the development of our people,determined to make our highly-experienced tradespeople renowned as the best in their industries.
With over 85 years of documented lessons learned, we are able to consistently apply that knowledge - meeting our customer's most demanding challenges, in their most critical environments.
Star BurstPERFORMANCE IN DIVERSE MARKETS
Black & MCDonald